Royal Birmingham Conservatoire
Gallery
In Brief

Client: 
Birmingham City University

Location:
Birmingham

Construction value: 
£42,500,000

Completion:
September 2017

Royal Birmingham Conservatoire’s new state-of-the-art home is the first purpose-built music college to be constructed in the UK since 1987 and is the only one in the country which has been specifically designed to cater for the demands of the digital age.

It houses five performance venues: a public concert hall with the capacity of 500 seats and a full orchestra, a 150 seat recital hall, The Lab - a ‘black box’ experimental music space, a 100 seat organ studio and the Eastside Jazz Club as well as 70 practice rooms of various sizes.

The new building is in the heart of the City's learning quarter, on the border between Birmingham and Aston. It will act as a cultural hub, contributing to the performing and visual arts within the city and region, as well as for students of the University.

The combination of careful attention to purpose-built detail, together with an over-arching vision of artistic and educational ambition, has delivered a lasting monument to the cultural investment of the City and the University. 

Music Box
Video Cover Image

See how the Royal Birmingham Conservatoire brings together the very public world of performance and the private and intense world of rehearsal.

Watch video
Design

The main foyer serves the five major performance venues and provides a rich and spatially diverse welcome to the building. It forms a route which connects the city and campus entrances and divides the rehearsal spaces on the north from the performance spaces on the quieter, traffic free, south side of the building.

The Recital Hall, The Lab and Eastside Jazz Club occupy the lower ground floor, with the Concert Hall and the Organ Studio above them on the first floor. Practice and rehearsal spaces are arranged in clusters around the different musical departments on the north side of the building.

Narrow Module Image
Testimonial
Quote Image

"The architectural choreography of the Conservatoire's complex brief and its range of different spaces has been handled with a deft touch... surely destined to become one of Birmingham's most actively used and cherished public venues."

RIBA National Awards, Judges' citation

"If anything, it has exceeded our expectations - in particular the acoustics of the five performance spaces. The main hall is the gem. It is a really fantastic acoustic, but if there is one adjective to describe it, i think it's warm."

Julian Lloyd Webber, Principal, Royal Birmingham Conservatoire

"Our new building is the best of its kind: a space that is both warm and uplifting, both professional and humane."

David RobertsPro Vice Chancellor, Faculty of the Arts, Design & Media, Birmingham City University

"The architectural choreography of the Conservatoire's complex brief and its range of different spaces has been handled with a deft touch - clear testimony to the close collaboration of architect and client team."

RIBA National Awards 2018, Judges' citation
Context

Built on a prominent city centre site, the Conservatoire acts as a cultural hub.

Designed to contribute to the performing and visual arts within the city and region, the Conservatoire allows the University to play a key role in delivering the city’s strategy for arts and culture.

The Conservatoire is in Birmingham’s Eastside, part of BCU’s City Campus and creates a new entrance to the campus from the main artery of Jennens Road.  A through-foyer serves to connect the street to the campus, and also negotiates the full-storey level change from the north to the south of the building. A landscaped route continues into an external performance space in the southern courtyard. 

Narrow Module Image
Acoustics

With Hoare Lea, we aimed to create acoustic environments that would be amongst the very best in the world.

To fit within the small footprint of the building, the five venues are stacked above one another over three levels, creating a 3D puzzle where potential sound transfer must be avoided. Each venue is structurally separate, with heavy massed floor and wall construction within steel frames to form isolated inner boxes within the larger ‘box’ of the Conservatoire.

The five venues each has their own particular character, visually and acoustically, the Concert Hall being the most complex. A combination of fine and larger scale diffusion and sound scattering treatments cover the walls and work to produce a rich, even and diffuse sound field. 

Narrow Module Image
Sustainability

The specialist acoustic requirements of the building made mechanical ventilation and some cooling a necessity, so energy efficiency was driven through careful selection of highly efficient systems, taking on-site generation opportunities where possible.

Ventilation systems feature full heat recovery and high efficiency fan systems, while lighting is LED throughout with advanced daylight and occupancy sensing.  Electrical generation is achieved on site through a combination of rooftop PV and a combined heat and power plant providing space heating and electrical generation. 

Narrow Module Image
Selected Awards

2018 RIBA National Award

2018 RIBA West Midlands Project of the Year

2018 RIBA West Midlands Award

2018 RICS West Midlands Project of the Year

2018 RICS West Midlands Design for Innovation Award

2018 Civic Trust Regional Award

Narrow Module Image
Team

Client: Birmingham City University
Contractor: Galliford Try Plc
CDM: Faithful + Gould
Cost Consultant: Faithful + Gould
Structural, Civil Engineer: WYG
Theatre Consultant: Charcoalblue
Landscape Consultants: Planit-IE Ltd
M&E Design: Hoare Lea
Communication Design Consultant: Thomas Matthews
Planning Consultant: Brook Smith Planning
Catering Consultant: Keith Winton Design
Photography: Hufton + Crow

Narrow Module Image
Drawings
Explore more Arts & Culture projects:
Explore more Higher Education projects: